SIS Commissioning Process and Digitalization with Open-PHA™

The IEC 61511 standard for safety lifecycle mandates commissioning of safety instrumented systems before they are put into service. Clause 14 outlines the requirements for this process, involving equipment inspection, signal verification, calibration, and control transfer. Deviations from design documentation must be identified and corrected before progressing in the SIS safety lifecycle.

In this webinar, we will discuss IEC 61511 commissioning requirements, offer insights, examples, and showcase the use of Open-PHA™ checklists and associated tools.

Please join us for this upcoming webinar, hosted by DMS Universe on Monday, 6th May, 10AM Gulf Standard time.

Click the link below to learn more and register.